The site as first ever viewed
The site now cleared of the window high scrub
200 tons of soil later I could certainly dig
Lowering the site to help the ‘bed in garden’ feel
0600 - our 2nd concrete pour due
0730 - friends all grafting away
Some of the smaller beams going in
Beam laying the Egyptian way
Site pretty much ready
Main floor ready
Olly and I filling the re-inforced walls
Structure well under way
Claire making cereal model
Cladding goes on to the structure
Confirming our curved laminate design
Ben making up studio front glazed wall strucure
Studio front glazed wall
Chris and Abdul inside the main space
Claire paints the loo
Our first ever night in the house
The morning after an interim party
Trying to get the house to actually 'work'
View into master bedroom
Front mezzanine pod room window open
The studio front
Rooflight hole from above
Main room from entrance
The twisting side wall to studio
View from rear mezzanine desk
View ino the garden from the master bedroom
View of the house
Studio doors flung wide
The flush fitting shower head
In the small shower room space
The blade flame fireplace
Shelving in main space
Lightweight panelled front studio wall
Bed slides away
Kitchen counter
Kitchen sloped wall
Main room looking east
Main space looking back
Main space viewed from original position
Main space viewed through roof hole